合肥生活安徽新闻合肥交通合肥房产生活服务合肥教育合肥招聘合肥旅游文化艺术合肥美食合肥地图合肥社保合肥医院企业服务合肥法律

代写MTH5510、代做Matlab程序语言

时间:2024-08-15  来源:合肥网hfw.cc  作者:hfw.cc 我要纠错



MTH5510: QRM - Exercises Set 2
Due date: August 12, 2024;12:00pm;
Analysis the output of the Matlab code is mandatory. I am not interested just to the Matlab code.
Hand in stapled hardcopy at the beginning of the tutorial session
Note: You might want to use Matlab for this exercise; adequately report and comment on your
results (For a quick introduction to Matlab visit http://www.mathworks.com/access/helpdesk/
help/pdf_doc/matlab/getstart.pdf)
Exercise I: This question deals with a portfolio of five stocks. At time t, the values of the stocks
are S1,t = 100, S2,t = 50, S3,t = 25, S4,t = 75, and S5,t = 150. The portfolio consists of 1 share
of S1, 3 shares of S2, 5 shares of S3, 2 shares of S4, and 4 shares of S5. These risk factors are
logarithmic prices and the factor changes have mean zero and standard deviations 10?3, 2 · 10?3,
3 · 10?3, 1.5 · 10?3, and 2.5 · 10?3, respectively. The risk factors are independent.
1. Compute VaRα, VaR
mean
α , and ESα using Monte Carlo with 10,000 simulations. Do this for
α = {0.**, 0.91, . . . , 0.99}. Also use the following distributions for the risk factor changes:
 For each i ∈ {1, 2, 3, 4, 5}, Xi,t+δ ~ t(3, μ, σ) for appropriate values of μ and σ
 For each i ∈ {1, 2, 3, 4, 5}, Xi,t+δ ~ t(10, μ, σ) for appropriate values of μ and σ
For each i ∈ {1, 2, 3, 4, 5}, Xi,t+δ ~ t(50, μ, σ) for appropriate values of μ and σ
 For each i ∈ {1, 2, 3, 4, 5}, Xi,t+δ ~ N (μ, σ2)
Plot the results.
2. Comment on the following:
 The value of VaRα compared to VaRmeanα
 The value of VaRα and ESα as compared between the four distributions. Are the results
what you expected?
Exercise II: This question deals with delta hedged call option. The following are the Black-
Scholes parameters for a European call option at time t = 0:
T = 0.5
rt = 0.05
σt = 0.2
St = 100
K = 100.
1
The portfolio consists of long position on the call option, and the corresponding position in the
stock which makes the portfolio delta neutral. Let ? = 1day, Z1 = log(S), and Z2 = σ (r
will be considered in this problem). The risk factor changes are normally distributed with mean
zero. Their standard deviations over one day are 10?3 and 10?4 and their correlation is ?0.5.
(a) Compute V aRα, V aR
mean
α , and ESα for α = 0.95 and α = 0.99 using the following
methods:
 Monte Carlo full revaluation with 10,000 simulations
 Monte Carlo on the linearized loss with 10,000 simulations
 Variance-covariance method
Do not neglect the time derivative in any linearizion in this question.
Exercise III: Let L have the Student t distribution with ν degree of freedom. Derive the
formula
ESα(L) =
(
gν(t
?1
ν (α))
1? α
)(
ν + (t?1ν (α))2
ν ? 1
)
.
You will need to look up the probability density function of the distribution at hand.
请加QQ:99515681  邮箱:99515681@qq.com   WX:codinghelp


 

扫一扫在手机打开当前页
  • 上一篇:代写CSCI 2600、java设计编程代做
  • 下一篇:MAST10006代做、Python/c++程序设计代写
  • 无相关信息
    合肥生活资讯

    合肥图文信息
    流体仿真外包多少钱_专业CFD分析代做_友商科技CAE仿真
    流体仿真外包多少钱_专业CFD分析代做_友商科
    CAE仿真分析代做公司 CFD流体仿真服务 管路流场仿真外包
    CAE仿真分析代做公司 CFD流体仿真服务 管路
    流体CFD仿真分析_代做咨询服务_Fluent 仿真技术服务
    流体CFD仿真分析_代做咨询服务_Fluent 仿真
    结构仿真分析服务_CAE代做咨询外包_刚强度疲劳振动
    结构仿真分析服务_CAE代做咨询外包_刚强度疲
    流体cfd仿真分析服务 7类仿真分析代做服务40个行业
    流体cfd仿真分析服务 7类仿真分析代做服务4
    超全面的拼多多电商运营技巧,多多开团助手,多多出评软件徽y1698861
    超全面的拼多多电商运营技巧,多多开团助手
    CAE有限元仿真分析团队,2026仿真代做咨询服务平台
    CAE有限元仿真分析团队,2026仿真代做咨询服
    钉钉签到打卡位置修改神器,2026怎么修改定位在范围内
    钉钉签到打卡位置修改神器,2026怎么修改定
  • 短信验证码 宠物饲养 十大卫浴品牌排行 suno 豆包网页版入口 wps 目录网 排行网

    关于我们 | 打赏支持 | 广告服务 | 联系我们 | 网站地图 | 免责声明 | 帮助中心 | 友情链接 |

    Copyright © 2025 hfw.cc Inc. All Rights Reserved. 合肥网 版权所有
    ICP备06013414号-3 公安备 42010502001045